Austar Ventilation Shaft

Austar ventilation shaft project consisted of designing and constructing a 465m deep ventilation and people riding shaft for Austar’s Coal Mine in the Hunter Valley. The shaft provides ventilation and access to the mine’s stage 3 underground workings.

The composite steel and concrete lining has a finished internal diameter of 4.5m. The liner is fully water-tight and maintenance free.

Client

Austar Coal Mine Pty Ltd

Year

2012

Region

NSW

Share

m
Shaft Depth
m
Finished Shaft Diameter
%
Allowable Shaft Tolerance Achieved
RELATED PROJECTS
Clinker Place Stormwater Pipeline
Clinker Place Stormwater Pipeline
Luggage Point Sewage Treatment Plant
Luggage Point Sewage Treatment Plant Bioreactor Refurbishment
Brendale ATP Bypass
Brendale ATP Bypas
Picton WasteWater Treatment Plant Upgrade Stage 2 Aerial View
Picton Wastewater Treatment Works- Stage 2 Upgrade
Bondi STP Odour Control job
Bondi STP Odour Control