Austar Ventilation Shaft

Austar ventilation shaft project consisted of designing and constructing a 465m deep ventilation and people riding shaft for Austar’s Coal Mine in the Hunter Valley. The shaft provides ventilation and access to the mine’s stage 3 underground workings.

The composite steel and concrete lining has a finished internal diameter of 4.5m. The liner is fully water-tight and maintenance free.

Client

Austar Coal Mine Pty Ltd

Year

2012

Region

NSW

Share

m
Shaft Depth
m
Finished Shaft Diameter
%
Allowable Shaft Tolerance Achieved
RELATED PROJECTS
Tunnel Boring Machine in shaft about to drill tunnel
Burrows Road Tunnel
Tunnel Boring Machine in Shaft at Kalkallo Sewer Main
Kalkallo Creek Trunk Sewer Main Stage 1
Dendrobium Vent Shaft aerial view of site
Dendrobium Ventilation Shafts
Birds view of bllind bore drill rig onsite
Integra Ventilation Shaft
Two men standing at top of blind bored mine ventilation shaft
North Goonyella Ventilation Shaft No 4