Barwon Water Mains Renewal Program
Abergeldie DKM has been working with Barwon Water to renew their water mains infrastructure over the last 7 years. The current contract has been held since 2021 and targets the replacement of reticulated water mains that pose a risk to customer supply.
Under the current contract, 14km of renewed pipelines have been installed within the Barwon Water service area which stretches over 8,100 square kilometres, from Little River and the Bellarine Peninsula in the east, to Colac in the west, and from Meredith and Cressy in the north, to Apollo Bay on Victoria’s south-west coast.
The current program features 121 water renewal projects of varying complexities, classified as either short pipelines (<100m in length) or long pipelines (>100m in length).