our projects

Providing the Complex Infrastructure Needed to Build Better Communities

Clinker Place Stormwater Pipeline

Abergeldie is delivering the Clinker Place Stormwater Pipeline for Auckland Council to improve the stormwater network in the area, futureproofing it for the development of the Clinker Place special housing area in New Lynn.

The new stormwater pipe will run approximately 550m from the Clinker Place development site on Rankin Avenue, continuing underneath Ambrico Place to a new outfall in Manawa Wetland Reserve.

A tunnel boring machine (TBM) is being used to limit disruption to local residents with 400m of the pipeline to be installed by tunnelling. The rest will be installed by digging from above the ground.

Client

Auckland Council

Year

In Progress

Region

NZ

Share

m
New Stormwater Pipe
m
Pipeline installed by tunnelling
m
Pipeline installed by digging from above the ground
RELATED PROJECTS
default
Coolmunda Dam Gates Variable Counterweights Refurbishment
DCIM101MEDIADJI_0129.JPG
Murrumba Downs STP Sludge Dewatering and Biosolids Out-loading Renewal
Balickera Tunnel Entrance
Balickera Tunnel Remediation
Waiau Street Stormwater Upgrade
Waiau Street Stormwater Upgrade
Wynyard Quarter Wastewater Rising Main pipe jack
Wynyard Quarter Wastewater Rising Main