Coolmunda Dam Gates Variable Counterweights Refurbishment

Abergeldie is working with Sunwater to refurbish the Coolmunda Dam Gates Variable Counterweights (VCW). The refurbishment will strengthen the Dam Gates 1 and 2 by reinforcing the counterweights, minimising future maintenance needs and ensuring that the gates operate reliably 

Client

Sunwater

Year

In progress

Region

QLD

Share

New Variable Counterweights
15 tonne capacity custom-made lifting frame designed and constructed
2023 Nomination for Engineers Australia Project Excellence Award (QLD)
RELATED PROJECTS
DCIM101MEDIADJI_0129.JPG
Murrumba Downs STP Sludge Dewatering and Biosolids Out-loading Renewal
Balickera Tunnel Entrance
Balickera Tunnel Remediation
Cessnock WWTW Upgrade Project Aerial Photo
Cessnock Wastewater Treatment Works Upgrade
Caboolture South Recycled Water Disinfection Facility
Caboolture South Recycled Water Disinfection Facility
Clinker Place Stormwater Pipeline
Clinker Place Stormwater Pipeline