OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Kalkallo Creek Trunk Sewer Main Stage 1

Abergeldie, was engaged to design and construct the trenchless portions of Stage 1 of the new Kalkalo Creek Main Sewer (KCMS) is part of the Kalkallo Sewer Servicing Strategy for the Northern Growth Corridor. The total length of the proposed sewer is over 13km comprising of three stages of which Stage 1 is approximately 3.4km long.

Client

Yarra Valley Water

Year

2019

Region

VIC

Share

m
GRP Pipe Installed (ID1388)
m
Tunnel Depth
New Sewer Manholes Installed