OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Kalkallo Creek Trunk Sewer Main Stage 1

Abergeldie, was engaged to design and construct the trenchless portions of Stage 1 of the new Kalkalo Creek Main Sewer (KCMS) is part of the Kalkallo Sewer Servicing Strategy for the Northern Growth Corridor. The total length of the proposed sewer is over 13km comprising of three stages of which Stage 1 is approximately 3.4km long.

Client

Yarra Valley Water

Year

2019

Region

VIC

Share

m
GRP Pipe Installed (ID1388)
m
Tunnel Depth
New Sewer Manholes Installed
RELATED PROJECTS
Clinker Place Stormwater Pipeline
Clinker Place Stormwater Pipeline
Luggage Point Sewage Treatment Plant
Luggage Point Sewage Treatment Plant Bioreactor Refurbishment
Brendale ATP Bypass
Brendale ATP Bypas
Picton WasteWater Treatment Plant Upgrade Stage 2 Aerial View
Picton Wastewater Treatment Works- Stage 2 Upgrade
Bondi STP Odour Control job
Bondi STP Odour Control