OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Luggage Point Sewage Treatment Plant Bioreactor Refurbishment

Urban Utilities engaged Abergeldie for the design and staged construction of replacement of diffusers and refurbishment of aeration lines, valves, and degraded concrete in six bioreactor tanks at the Luggage Point Sewage Treatment Plant.

Client

Urban Utilitites

Year

2018

Region

QLD

Share

RELATED PROJECTS
Brendale ATP Bypass
Brendale ATP Bypas
Picton WasteWater Treatment Plant Upgrade Stage 2 Aerial View
Picton Wastewater Treatment Works- Stage 2 Upgrade
Bondi STP Odour Control job
Bondi STP Odour Control
West Region Delivery Team
West Region Delivery Team (WRDT)
Tunnel Boring Machine in shaft about to drill tunnel
Burrows Road Tunnel