North Goonyella Ventilation Shaft No 4

Due to our success in completing works at North Goonyella Ventilation Shaft No. 4, Abergeldie was engaged to bore and line the mine’s Ventilation Shaft No.

The Shaft was bored from surface to 84m depth at 6.8m diameter and steel lined through Tertiary strata. Then remainder of the shaft was completed at 6.15m diameter to coal seam level at 272m total depth.

Client

Peabody North Goonyella Coal Mines

Year

2007

Region

QLD

Share

m
Total Drilled Depth
m
Diameter
Steel Lined Section (84m deep)
m
Diameter
Composite Lined Section (85-272m deep)