Our projects

Providing the Complex Infrastructure Needed to Build Better Communities

Grahamstown Wastewater Treatment Plant Upgrades

The Grahamstown Wastewater Treatment Plant treats raw water to produce quality suitable to safely drink. Part of the Hunter Water Growth Plan, Abergeldie was engaged by Hunter Water to upgrade the sediment tank. Delivered under brownfield conditions, Abergeldie ensured that the tank was available for the duration of the works for the benefit of the many people it services.

Client

Hunter Water Corporation

Year

In Progress

Region

NSW

Share

Sediment Tanks Replaced
%
Daily Supply Requirements Provided for Region
New Hose-Down Connection Points
RELATED PROJECTS
Tunnel Boring Machine in shaft about to drill tunnel
Burrows Road Tunnel
Tunnel Boring Machine in Shaft at Kalkallo Sewer Main
Kalkallo Creek Trunk Sewer Main Stage 1
Dendrobium Vent Shaft aerial view of site
Dendrobium Ventilation Shafts
Blind boring rig drilling on mine site
Austar Ventilation Shaft
sfpjv logo
Safety Focused Performance Joint Venture (SFPJV)