The works to upgrade the Sludge Dewatering System and Biosolids Out-Loading Facility at the Murrumba Downs STP include detailed design, construction and installation and commissioning and proof of performance testing.
The detailed design includes:
- Walkways, platforms and stairs
- Structural building and design to house essential and supporting equipment
- Connections to existing site services
- Concrete works
- General Layout
- Mechanical and piping
- Hydraulic design
- Electrical instrumentation and controls
- DeltaV DCS updates
- SID, HAZOp, Design report, equipment/instrument/cable schedules
- Hazardous area verification and update of site dossier
The construction and installation involves:
- All temporary works and liaison with operations
- Construction of new mechanical, electrical, civil and structural infrastructure
- Fabrication, trial assembly, testing, supply, delivery to site, installation and commissioning of all equipment
- Installation of supplied materials and equipment
- Decommissioning and disposal of redundant infrastructure
- All other works to facilitate the construction and ongoing operation of the Sludge Dewatering System and the Biosolids Out-loading Facility.