OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Maroochydore Sludge Thickening Upgrade

Abergeldie delivered the Maroochydore sludge thickening upgrade in collaboration with Unitywater to improve the capacity and reliability of the Maroochydore Sewerage Treatment Plant (STP). The STP serves the coastal strip from Alexandra to Maroochy River (including the Maroochydore Priority Development Area). Upgrades to the STP’s ageing infrastructure (including improvements to sludge thickening capacity and reliability of service) accommodate the area’s increased capacity demand due to population growth and reduce ongoing maintenance costs.

Client

Unitywater

Year

2021

Region

QLD

Share

D
Design Utilised
%
92% client satisfaction result
Three gravity drainage decks installed
RELATED PROJECTS
Clinker Place Stormwater Pipeline
Clinker Place Stormwater Pipeline
Luggage Point Sewage Treatment Plant
Luggage Point Sewage Treatment Plant Bioreactor Refurbishment
Brendale ATP Bypass
Brendale ATP Bypas
Picton WasteWater Treatment Plant Upgrade Stage 2 Aerial View
Picton Wastewater Treatment Works- Stage 2 Upgrade
Bondi STP Odour Control job
Bondi STP Odour Control