OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Burrows Road Tunnel

Abergeldie constructed an underground cable tunnel beginning in Campbell Road, running below Burrows Road, and finishing at the Energy Australia (EA)/ Transgrid substation in Alexandria. The tunnel carries 6 x 132kV circuits.

The project featured a launching shaft, an 87m long, 2800mm diameter, pipe jacked tunnel and a receiving shaft. The receiving pit featured 2 stages of construction, a temporary shaft to allow for the removal of an EPBM and further modifications to construct the final pit which sits within the EA boundary of the new substation.

Client

Energy Australia

Year

2010

Region

NSW

Share

m
Tunnel Length
mm
Tunnel Diameter
mm
Within Specified Alignment
RELATED PROJECTS
Avon River 3 WR
Avon River Precinct Project
P1190834_WR
City Rail Link C2- Enabling Works Contract
Madden to Pakenham_2 1200 x 900 px
Madden to Pakenham Street Stormwater Upgrades
Cessnock WWTW Upgrade Project Aerial Photo
Cessnock Wastewater Treatment Works Upgrade
Caboolture South Recycled Water Disinfection Facility
Caboolture South Recycled Water Disinfection Facility