Burrows Road Tunnel

Abergeldie constructed an underground cable tunnel beginning in Campbell Road, running below Burrows Road, and finishing at the Energy Australia (EA)/ Transgrid substation in Alexandria. The tunnel carries 6 x 132kV circuits.

The project featured a launching shaft, an 87m long, 2800mm diameter, pipe jacked tunnel and a receiving shaft. The receiving pit featured 2 stages of construction, a temporary shaft to allow for the removal of an EPBM and further modifications to construct the final pit which sits within the EA boundary of the new substation.

Client

Energy Australia

Year

2010

Region

NSW

Share

m
Tunnel Length
mm
Tunnel Diameter
mm
Within Specified Alignment
RELATED PROJECTS
Tunnel Boring Machine in Shaft at Kalkallo Sewer Main
Kalkallo Creek Trunk Sewer Main Stage 1
Dendrobium Vent Shaft aerial view of site
Dendrobium Ventilation Shafts
Blind boring rig drilling on mine site
Austar Ventilation Shaft
Birds view of bllind bore drill rig onsite
Integra Ventilation Shaft
Two men standing at top of blind bored mine ventilation shaft
North Goonyella Ventilation Shaft No 4