Abergeldie has been selected by WaterNSW to deliver the Warragamba Pipeline Valves and Controls Upgrade to improve the existing level of service, ensuring a safe and reliable water supply across Sydney. The Warragamba pipelines consist of two parallel pipelines that deliver raw water via gravity from Warragamba Dam to Sydney Water’s water treatment plants at Warragamba, Orchard Hills, and Prospect.
The scope of works will see Abergeldie facilitate the design and construction required to replace or refurbish a total of 23 major valves and upgrade associated power supplies and control systems, replace existing access structures, install CCTV at major cross connections and install a reliable pipeline pressure monitoring and breakage detection system.
Abergeldie CEO, Mark Bruzzone said “We are really thrilled to be working with WaterNSW on highly complex and critical infrastructure upgrade for the people of Sydney. We look forward to applying our decades of experience to improve the asset reliability, water quantity, safety and security across the Warragamba Pipeline.”